<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0"><channel><title><![CDATA[PPI site]]></title><description><![CDATA[PPI site]]></description><link>https://www.ppi-engineering.com/blog</link><generator>RSS for Node</generator><lastBuildDate>Sat, 03 Oct 2026 21:51:39 GMT</lastBuildDate><atom:link href="https://www.ppi-engineering.com/blog-feed.xml" rel="self" type="application/rss+xml"/><item><title><![CDATA[32.2 MW 4 Pole Synchronous Generator – Kaide]]></title><description><![CDATA[About Wuhuan Engineering Co. Ltd., formerly the 4th Design Institute of Ministry of Chemical Industry, was founded in 1958. It is now a wholly-owned subsidiary of China National Chemical Engineering Group Corporation under direct charge of State-owned Assets Supervision and Administration Commission of the State Council and is also a key science-and-technology enterprise in chemical industry.Wuhuan Engineering Co. Ltd. has a high-quality team with abundant specialties, rich experience and...]]></description><link>https://www.ppi-engineering.com/post/32-2-mw-4-pole-synchronous-generator-kaide</link><guid isPermaLink="false">6aacfce693059a0bb372f99b</guid><pubDate>Fri, 18 Sep 2026 08:59:23 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/631b7f_5c889ffefe614ba39c95ecd4b46dc774~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator></dc:creator></item><item><title><![CDATA[Design of High Speed 2 Pole Synchronous Compressor Motor – China Natural Gas Pipelines]]></title><description><![CDATA[About CNPC is China’s largest oil and gas pipeline contractor and operator. CNPC owns and operates pipeline networks and storage systems covering 29 provinces, municipalities and autonomous regions as well as Hong Kong SAR in China. By the end of 2014, their oil and gas pipelines in China totaled 79,054 kilometers in length, including 18,132 kilometers for crude oil, 50,836 kilometers for natural gas and 10,086 kilometers for refined products, accounting for nearly 70%, 78% and 47% of the...]]></description><link>https://www.ppi-engineering.com/post/design-of-high-speed-2-pole-synchronous-compressor-motor-china-natural-gas-pipelines</link><guid isPermaLink="false">6aacfba0a365c011f9cf6f9d</guid><pubDate>Fri, 18 Sep 2026 08:55:33 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/631b7f_e014dc0e86d045f59d8cddc38ae01a51~mv2.jpg/v1/fit/w_1000,h_516,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator></dc:creator></item><item><title><![CDATA[Revitalise Your Rotating Equipment: The Vital Importance of Regular Servicing and Refurbishing]]></title><description><![CDATA[Electrical rotating equipment and machinery play a crucial role in many industries, from manufacturing, defence, transportation, energy and power generation. These machines are used to generate, transmit, and convert electrical power and they are essential to the functioning of many critical systems. However, like any other type of machinery, electrical rotating equipment requires regular maintenance and refurbishment to ensure it remains reliable and efficient. PPI Engineering shares the...]]></description><link>https://www.ppi-engineering.com/post/revitalise-your-rotating-equipment-the-vital-importance-of-regular-servicing-and-refurbishing</link><guid isPermaLink="false">6aabecc4fd682982958e118c</guid><pubDate>Thu, 17 Sep 2026 13:39:22 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/631b7f_e75a5ec0f41f4001b7a8f5f138970d31~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator></dc:creator></item><item><title><![CDATA[Updated software for design of PMGs]]></title><description><![CDATA[A permanent magnet generator (PMG) is an important part of the brushless self-excited system for large synchronous machines. It provides ‘self-excitation’ through the permanent magnets spinning on the rotor shaft of the main machine itself. Thus, no external power supply is required for excitation of the machine. PPI Engineering’s in-house software programme for designing PMGs, ‘DCPMG’, has been undergoing an upgrade. To make the design process for a PMG quicker and easier for the designer,...]]></description><link>https://www.ppi-engineering.com/post/updated-software-for-design-of-pmgs</link><guid isPermaLink="false">6aabf102348a6f0cf362bc7e</guid><pubDate>Wed, 16 Sep 2026 13:56:05 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/631b7f_78a53b8af143461ebe4730724ab69c56~mv2.jpg/v1/fit/w_512,h_326,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator></dc:creator></item><item><title><![CDATA[Why apprenticeships are crucial for the Engineering sector]]></title><description><![CDATA[It’s National Apprenticeship Week between 7th – 13th February 2022 and for apprentices, the right placement could give them crucial experience and an all-important foot into the Engineering industry. Building for the future Around the world, countries are constantly looking to develop their infrastructure, improve their power supply systems and produce more effective and innovative machinery. For this to be achieved, there needs to be enough skilled resource to supply the demand and current...]]></description><link>https://www.ppi-engineering.com/post/why-apprenticeships-are-crucial-for-the-engineering-sector</link><guid isPermaLink="false">6aabf1df49ba8e0087bfcfc3</guid><pubDate>Tue, 15 Sep 2026 14:00:48 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/631b7f_26aa90eef833437095635a75a4f5143e~mv2.jpg/v1/fit/w_1000,h_588,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator></dc:creator></item><item><title><![CDATA[Investment in Support for Offshore Renewables]]></title><description><![CDATA[A new business expansion opportunity PPI Engineering is delighted to announce a new business expansion opportunity that has been supported by New Anglia Local Enterprise Partnership through their Business Resilience Grant Scheme. The Project PPI Engineering have identified an opportunity to provide ongoing condition monitoring and technical design and maintenance support for the electrical power generation equipment installed in offshore renewables. In order to support its entry into this...]]></description><link>https://www.ppi-engineering.com/post/investment-in-support-for-offshore-renewables</link><guid isPermaLink="false">6aabf305fd682982958e2086</guid><pubDate>Mon, 14 Sep 2026 14:05:09 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/631b7f_37c538dd16624adc9703d5e76804cf17~mv2.jpg/v1/fit/w_850,h_400,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator></dc:creator></item><item><title><![CDATA[PPI Awarded JOSCAR Certification]]></title><description><![CDATA[We are officially a JOSCAR certified supplier This highly valued accreditation register is regarded by companies and purchasers in the Aerospace, Defence, Security &#38; Space sectors as a trusted tool to identify qualified suppliers. In order to be awarded the certification PPI were required to pass a rigorous process in which the appropriate capabilities, a great level of commitment and the correct credentials were evaluated. In order to evaluated these areas, JOSCAR assesses company operations...]]></description><link>https://www.ppi-engineering.com/post/ppi-awarded-joscar-certification</link><guid isPermaLink="false">6aabf3d4348a6f0cf362c2c8</guid><pubDate>Sun, 13 Sep 2026 14:07:07 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/631b7f_16d24696fd7e416ca5d85804806d9c17~mv2.jpg/v1/fit/w_800,h_450,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator></dc:creator></item><item><title><![CDATA[COVID-19 Statement]]></title><description><![CDATA[PPI Remain Fully Operational During Covid-19 Pandemic PPI Engineering Ltd are pleased to announce that we are still operating in a fully safe and compliant manner during the Covid-19 pandemic, despite global restrictions. As a company we have taken extra precautions to ensure our workshops and facilities across the globe are COVID secure, are compliant with all government guidelines and that our employees and engineers can work safely. The safety of our customers and employees remains our...]]></description><link>https://www.ppi-engineering.com/post/covid-19-statement</link><guid isPermaLink="false">6aabf4571985ca71b50bae80</guid><pubDate>Sat, 12 Sep 2026 14:09:38 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/631b7f_0cb16af8b70c44f7a008eb8e9d1d796c~mv2.jpg/v1/fit/w_670,h_448,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator></dc:creator></item><item><title><![CDATA[Partial Discharge Testing]]></title><description><![CDATA[What is Partial Discharge and why test for it? Partial Discharge (PD) is an electrical discharge or spark across a void or gap. This can take place between two electrodes (e.g. in a motor, the copper conductor and earth) without completely bridging across the two electrodes — Hence the term “Partial”. These voids and gaps occur because of manufacturing processes, thermal deterioration over time, poor fitting of the coils, and coil movement due to looseness and vibration etc. Other forms of PD...]]></description><link>https://www.ppi-engineering.com/post/partial-discharge-testing</link><guid isPermaLink="false">6aabf4df49ba8e0087bfd6b7</guid><pubDate>Fri, 11 Sep 2026 14:21:01 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/631b7f_6a53213a6b944b76b596be787a21f772~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator></dc:creator></item></channel></rss>